In maintaining connectivity and continuity as identified in the Purpose and Need Statement, it would not be possible to develop a free-flow condition (limited access, no main-line stop signs or signals) through the larger towns. Alternatives through the towns that maintained free flow conditions were developed during the analysis but were eliminated from further consideration, due in part to the large number of business displacements.